← Every company
RTX Corp Patents
What RTX Corp has filed at the patent office — applications as well as grants, because a filing is on the record eighteen months before anyone has to say what it was for.
RTX on carbonthat →Filings on file
77
Granted
0
Still pending
77
Filed under
3 names
77 filings
Newest filing first. A pending application has no patent number yet, and most never get one.
| Invention | Patent |
|---|---|
| TURBINE ENGINE TIP CLEARANCE CONTROL UTILIZING ELECTRIC MACHINEF01D 15/10, B64D 27/33, B64D 31/18, F01D 11/20, F01D 11/22, F01D 11/24, F05D2220/76, F05D2270/053, F05D2270/335, Y02T 50/60Filed as RTX Corporation2026-06-22Graham R. Philbrick | pending |
| AIRCRAFT WITH SYMMETRIC PROPULSION SYSTEM ROTATING PATTERNSB64D 27/12, F02C 3/10, B64D 27/10, B64D 27/14, B64D2027/005, F02C 3/107, F02C 6/206, F02K 3/02, F02K 3/072, F02K 3/12Filed as RTX Corporation2026-06-22Andrew E. Breault | pending |
| ENVIRONMENTAL BARRIER COATINGC04B 41/009, C04B 41/87, C04B 35/5603, C04B 35/565, C04B 41/5024, C04B 41/5035, C04B 41/5089, C04B 41/52, C04B 41/89, C04B2103/0012, C04B2111/00612, C04B2235/3418, C04B2235/3826, C04B2235/3895, F01D 5/282, F01D 5/284, F01D 5/288, F05D2300/211, F05D2300/2261, F05D2300/6033, F23R 3/007, Y02T 50/60, C04B 35/80, C04B 41/4539, C04B 41/5059, C04B2103/0011, C04B 41/522, C04B 41/5042Filed as RTX CORPORATION2026-06-17Zhongfen Ding | pending |
| SYSTEM AND METHOD FOR CONTROLLING CONTRAIL FORMATIONF02C 7/06, F02C 9/16, F05D2260/609, F05D2260/98, F05D2270/08, F05D2270/3015, F05D2270/311, F05D2270/312, F05D2270/313Filed as RTX Corporation2026-06-17Timothy S. Snyder | pending |
| ASSEMBLY CONTROL WITH AUTHENTICATION OF CONTROL SYSTEMG05B 19/4155, G05B 23/0289, G05B2219/31044Filed as RTX Corporation2026-06-15Paul A. Adamski | pending |
| METAL-BASED FUEL AND FUEL DELIVERY SYSTEMSF02C 3/26, F02C 7/222, F02K 3/06, F23D 17/005, F23R 3/36, F23R 3/50Filed as RTX Corporation2026-06-11Justin R Urban | pending |
| PARTIAL EXHAUST CONDENSATION REGENERATORF02C 3/305, F01D 25/30, F01D 25/32, F02C 3/34, F05D2220/323, F05D2260/213Filed as RTX CORPORATION2026-06-10Neil J. Terwilliger | pending |
| ACTIVE THERMAL MANAGEMENT OF FUEL SYSTEMS AND FUEL NOZZLES FOR MORE ELECTRIC ENGINESF02C 7/18, F01D 15/08, F02C 6/08, F02C 9/18, F05D2260/607, F05D2260/608Filed as RTX Corporation2026-06-10Thomas Clark | pending |
| WATER COOLED EXHAUST DUCTF02C 3/30, F02C 6/18, F01D 25/12, F02C 3/22, F02C 3/305, F02C 7/1435, F02C 7/16, F02K 1/822, F05D2260/213Filed as RTX Corporation2026-06-09Jon Erik Sobanski | pending |
| HEAT EXCHANGER WITH ENHANCED HEAT TRANSFER MANIFOLDF28F 9/028, F28F 13/12, F28D2021/0021, F28D2021/0026, G01F 1/3209Filed as RTX Corporation2026-06-08Joshua Richards | pending |
| COOLING SYSTEM FOR AIRCRAFT POWERPLANT ELECTRONICSB64D 33/10, F01D 25/12, F05D2260/213Filed as RTX Corporation2026-06-08Thomas E. Clark | pending |
| CMC AIRFOIL WITH COOLING PASSAGE HAVING MULTI-DIMENSIONAL PLENUMF01D 5/02, F01D 5/282, C04B 35/565, C04B 35/80, C04B2235/5244, C04B2235/5252, C04B2235/614, C04B2235/616, C04B2235/94, F01D 5/187, F01D 5/284, F01D 9/065, F05D2240/122, F05D2240/304, F05D2260/204, F05D2300/6033, Y02T 50/60Filed as RTX CORPORATION2026-06-08James T. Roach | pending |
| CERAMIC MATRIX COMPOSITE SEAL REPAIRF01D 11/08, F01D 25/246, F01D 11/025, F01D 25/243, F05D2230/80, F05D2240/11, F05D2260/30, F05D2300/6033Filed as RTX CORPORATION2026-06-05Raymond Surace | pending |
| FILAMENT DISPERSION PROCESSC04B 35/565, C04B 35/80, C04B 35/571, C04B 35/573, C04B 35/62868, C04B 35/62897, C04B 35/63416, C04B 35/6342, C04B2235/5224, C04B2235/5228, C04B2235/5236, C04B2235/524, C04B2235/5244, C04B2235/5248, C04B2235/5252, C04B2235/606, C04B2235/608, C04B2235/614, C04B2235/616, C04B2235/65Filed as RTX Corporation2026-06-05Brendan LENZ | pending |
| PREFORM TAPERED HOLE PRESS FOR IMPROVED CVI-CMC MICROSTRUCTUREB29B 11/16, C04B 35/80, B26F 1/24, B29B 11/00, C04B 35/565, C04B 35/622, C04B 35/62884, C04B 35/62886, C04B 41/009, C04B 41/89, C04B2235/3826, C04B2235/5244, C04B2235/5256, C04B2235/60, C04B2235/614Filed as RTX Corporation2026-06-04Evan B. Callaway | pending |
| Turbine Engine Erosion Coating RepairB29C 73/10, F01D 5/005, F05D2230/80Filed as RTX Corporation2026-06-01John Michael Harner | pending |
| CONTROLLED PARTICLE INJECTION IN FABRIC FOR IMPROVED MICROSTRUCTRE HOMOGENEITY IN CMCsC04B 35/565, C04B 35/80, C04B 41/009, C04B 41/5025, C04B 41/87, C04B2235/3217, C04B2235/3244, C04B2235/3821, C04B2235/3826, C04B2235/3873, C04B2235/422, C04B2235/428, C04B2235/5244, C04B2235/5256, C04B2235/5436, C04B2235/616, C04B2235/786Filed as RTX Corporation2026-05-28Evan Benjamin Callaway | pending |
| SECONDARILY APPLIED COLD SIDE FEATURES FOR CAST HEAT EXCHANGERF28F 1/022, F28F 3/08, F28F 1/30, F28F 3/027, F28F 3/06, F28F2215/00Filed as RTX CORPORATION2026-05-26Michael A. Disori | pending |
| ENGINE TORSIONAL FRAME FOR EXHAUST CHANNEL TRACK SELECTIONF02C 7/224, F23R 3/005, F01D 15/10, F02C 9/40, F05D2220/323, F05D2220/60, F05D2220/76, F05D2260/213, F23R 3/36, Y02T 50/60Filed as RTX CORPORATION2026-05-22Gregory M. Chere | pending |
| ALTERNATE LUBRICATION MECHANISMS FOR VEHICLE BEARINGS OIL BAFFLES AND TRAPSF01D 25/16, F16N 37/003, F01D 25/18, F02C 7/06, F05D2260/22141, F05D2260/602, F05D2260/605, F05D2260/608, F05D2260/609, F05D2260/98, F16N 39/02, F16N2200/10, F16N2200/12, F16N2210/02, F16N2270/20Filed as RTX Corporation2026-05-21Alexander Robert Nelson | pending |
| INSPECTION SYSTEM FOR A GAS TURBINE ENGINEG01M 15/14, G05D 1/0291, G05D 1/689, G05D 1/69, F02C 7/00, F05B2260/83, G01M 5/0075, G05D 1/0094Filed as RTX CORPORATION2026-05-20Sheridon Haye | pending |
| CMC COMPONENT WITH COOLING CAVITYF01D 11/08, F01D 25/12, C04B 35/573, C04B 35/622, C04B 35/62844, C04B 35/80, C04B2235/428, C04B2235/5224, C04B2235/5228, C04B2235/524, C04B2235/5244, C04B2235/5256, C04B2235/6028, C04B2235/614, C04B2235/616, F01D 11/10, F01D 25/246, F02C 7/18, F05D2230/30, F05D2230/642, F05D2240/11, F05D2260/202, F05D2260/204, F05D2260/232, F05D2300/6033, F05D2300/6034Filed as RTX Corporation2026-05-15Cheng GAO | pending |
| ASSEMBLY CLIP FOR GAS ENGINE COMPONENTSF01D 11/08, F01D 25/246, F01D 11/003, F01D 25/243, F01D 25/285, F05D2230/60, F05D2240/11, F05D2240/56, F05D2260/38, F05D2300/43Filed as RTX CORPORATION2026-05-15Christopher PETERSON | pending |
| THERMAL BARRIER COATING FOR EDGE COMPONENTF01D 11/122, C04B 41/009, C04B 41/52, C04B 41/89, C04B 41/90, C04B2111/00982, F01D 5/08, F01D 5/284, F01D 5/288, F05D2230/90, F05D2240/11, F05D2240/15, F05D2300/5024, F05D2300/603, F05D2300/6033, F05D2300/611, C04B 35/80, C04B 41/5024, C04B2103/0021, C04B 41/522, C04B 41/51Filed as RTX Corporation2026-05-13Brian CRONIN | pending |
| ACCESSIBLE DEBRIS SEPARATOR FOR HIGH PRESSURE TURBINE OUTSIDE DIAMETER FED STATIC COMPONENTSF01D 25/32, F02C 7/05, F01D 5/081, F01D 5/087, F01D 11/10, F05D2220/323, F05D2240/55, F05D2260/607Filed as RTX Corporation2026-05-13Paul M Lutjen | pending |
| High Entropy AlloyC22C 30/00, C22C 27/02Filed as RTX Corporation2026-05-11Kenneth D. Smith | pending |
| GEARBOX ARRANGEMENT FOR CLOSE TO CONSTANT SPEED ACCESSORIESF02C 7/32, F01D 15/08, F01D 15/10, F01D 15/12, F02C 7/268, F02C 7/36, F02K 3/06, F05D2220/323, F05D2260/40311Filed as RTX Corporation2026-05-11Paul R. Hanrahan | pending |
| ELECTRONICALLY DRIVEN LUBRICATION SYSTEM ON GAS TURBINE ENGINESF01D 25/20, F02C 7/06, F02C 7/14, F05D2220/323, F05D2260/98, F05D2270/44, F16N 29/00, F16N2210/02, F16N2270/20, F16N2270/72Filed as RTX Corporation2026-05-05Sami Chukrallah | pending |
| COMPOUNDED TURBO POWER UNIT WITH BOOST COMBUSTORF02C 3/107, F02C 5/06, B64D 27/026, F02C 6/00, F02C 7/32, F02C 7/36, F05D2220/323, F05D2220/60, F05D2240/35, F05D2260/4031Filed as RTX CORPORATION2026-05-04Steven W. Burd | pending |
| MAINTAINABLE DESIGN FOR BEARING COMPARTMENT SERVICE LINE INCORPORATING A GROOVED ENDF01D 9/065, F01D 25/20, F01D 25/162, F01D 25/18, F05D2230/60, F05D2260/31, F05D2260/98Filed as RTX CORPORATION2026-04-30Nicholas Daniel Gnitzcavich | pending |
| PARTICLE ENHANCEMENT OF CERAMIC MATRIX COMPOSITES, METHOD OF MANUFACTURE THEREOF AND ARTICLES COMPRISING THE SAMEC04B 35/80, C04B 35/10, C04B 35/14, C04B 35/563, C04B 35/565, C04B 35/571, C04B 35/58092, C04B 35/583, C04B 35/584, C04B 35/62863, C04B 35/62884, C04B 35/62886, C04B 35/62892, C04B 35/62894, C04B 35/657, C04B2235/3826, C04B2235/3839, C04B2235/386, C04B2235/3865, C04B2235/3873, C04B2235/40, C04B2235/404, C04B2235/408, C04B2235/422, C04B2235/425, C04B2235/427, C04B2235/483, C04B2235/524, C04B2235/5244, C04B2235/5248, C04B2235/5252, C04B2235/5256, C04B2235/5276, C04B2235/528, C04B2235/5288, C04B2235/5292, C04B2235/5436, C04B2235/5445, C04B2235/5454, C04B2235/5472, C04B2235/5481, C04B2235/614, C04B2235/616, C04B2235/80, C04B2235/9607, C23C 16/045, C23C 16/325Filed as RTX Corporation2026-04-30Kathryn S. Read | pending |
| GAS TURBINE ENGINE STATIC VANE CLUSTERSF01D 9/044, Y10T 29/49337, F01D 5/147, F01D 5/282, F01D 5/284, F01D 9/041, F05D2230/237, F05D2240/12, F05D2240/80, F05D2240/81, F05D2300/222, F05D2300/6033, Y02T 50/60Filed as RTX Corporation2026-04-30Christian X. Campbell | pending |
| INSPECTION SYSTEMS AND ASSOCIATED METHODS FOR GAS TURBINE ENGINE COMPONENTSG06T 7/0006, G06T 7/62, G06T 7/50, G06T 7/11, G06T 7/70, F01D 21/003, F05D2260/81, F05D2260/83, G06T2207/10024, G06T2207/20081, G06T2207/20084, G06T2207/30108, G06T2207/30164Filed as RTX CORPORATION2026-04-29Krishna Rao | pending |
| LOW SPOOL ELECTRICAL MACHINE ARRANGEMENTS FOR HYBRID-ELECTRIC ENGINESB64D 27/33, F02C 7/32, B64D 27/406, B64D 27/10, B64D 33/08, F01D 15/10, F02C 7/20, F02K 3/06, F02K 5/00, F05D2220/76, F05D2260/4031, H02K 7/116, H02K 7/1823, H02K 9/18, Y02T 50/60Filed as RTX Corporation2026-04-29Thomas E. Clark | pending |
| AIRFOIL-MOUNTED ACOUSTIC RESONATOR ARRAY FOR GAS TURBINE ENGINE COMPONENTF01D 5/147, F01D 5/18, B33Y 80/00, B22F 10/25, B22F 5/04, F01D 9/02, F01D 9/041, F01D 25/30, F02C 7/24, F02K 3/06, F05D2220/36, F05D2240/30, F05D2260/963, F05D2300/514, B22F2999/00, B22F 3/1115Filed as RTX Corporation2026-04-29Ramons A. Reba | pending |
| EPICYCLIC GEAR REDUCTION CARRIER AND TORQUE FRAME CONNECTIONF02C 7/36, F02C 3/107, F05D2220/36, F05D2260/40311Filed as RTX Corporation2026-04-29Alessio Pescosolido | pending |
| INVERTING NEURAL RADIANCE FIELDS FOR PART AND SCENE POSE ESTIMATIONG06T 7/73, G06T 7/75, G06T 7/11, G06T 7/70, G06N 20/00, G06N 3/06, G06N 3/084, G06T 19/006, G06T2207/30244Filed as RTX Corporation2026-04-27Kin Gwn Lore | pending |
| ENVIRONMENTAL BARRIER COATINGC04B 41/89, C09D 5/084, C04B 41/009, C04B 41/4582, C04B 41/52, C04B2111/00982, C04B 35/80, C04B 35/565, C04B 41/4539, C04B 41/5024, C04B 41/5035Filed as RTX CORPORATION2026-04-20Xia Tang | pending |
| Targeted Ceramic Casting Core InhomogeneityB28B 1/087, B28B 1/24, B22C 9/10, B28B 1/0873, B28B 1/525, B28B 7/168, B28B 7/346, B28B 7/364, B28B 17/0081, B28B 21/86, C04B 35/14, C04B 35/16, C04B 35/481, C04B 35/622, C04B2235/3248, C04B2235/3418, C04B2235/3427, C04B2235/5212, C04B2235/526, C04B2235/5264, C04B2235/602, F01D 5/18, F01D 5/187, F01D 5/284, F05D2230/21, F05D2230/30, F05D2260/201, F05D2270/80, F05D2300/134, F05D2300/1723, F05D2300/20Filed as RTX Corporation2026-04-15Anthony J. Del Boccio | pending |
| AIRCRAFT AIR SYSTEM WITH BOOST COMPRESSOR(S)B64D 13/02, B64D 13/06, B64D 27/10, B64D2013/0618, B64D2013/0644, F02C 6/00, F02C 6/08, F02C 7/14, F02C 7/18, F02C 7/32, F05D2220/76, F05D2240/40, F05D2260/213, F05D2260/4023Filed as RTX Corporation2026-04-13Murat Yazici | pending |
| CERAMIC MATRIX COMPOSITE ARTICLE AND METHOD OF MAKING THE SAMEC04B 41/0036, C04B 41/52, C04B 41/0045, C04B 41/009, C04B 41/53, C04B 41/89, C04B 41/91, F01D 5/20, F01D 5/284, F01D 5/288, F01D 25/005, F05D2230/31, F05D2230/90, F05D2260/95, F05D2300/6033, F05D2300/611, F05D2300/6111, C04B 35/80Filed as RTX CORPORATION2026-04-13Michael G. McCaffrey | pending |
| FAN EXIT GUIDE VANE WITH LOAD CARRYING TENSION MEMBERF01D 9/042, F02C 7/045, F01D 5/147, F01D 9/041, F01D 9/065, F01D 25/04, F01D 25/06, F01D 25/246, F04D 29/542, F05D2220/36, F05D2230/60, F05D2240/12, F05D2260/96Filed as RTX Corporation2026-04-10Ioannis Alvanos | pending |
| STACKED APPROACH FOR DISTRIBUTED HYBRID PROPULSION WITH SCALABILITY AND MODULARITYB64D 27/33, F02C 6/20, H02J 1/106, H02J2105/32, B64D2221/00, F02C 6/14, F05D2220/76Filed as RTX Corporation2026-04-07Martin Amari | pending |
| ELECTRIC FIELD READOUT OF A SOLID-STATE SENSORH10D 62/53, H10D 62/8303, H10D 62/8325, H10D 30/471, G01K 11/00, G01L 1/005, G01R 29/12, G01R 33/02Filed as RTX BBN Technologies, Inc.2026-04-06Erik Eisenach | pending |
| INSPECTION PORT FOR AN ATTRITABLE ENGINE SUPPORT STRUCTUREF23R 3/002, F23R 3/54, B33Y 10/00, B33Y 80/00, Y02P 10/25, B33Y 40/20, B22F 5/009, B22F2998/00, B22F2999/00, F01D 21/003, F02C 7/25, F05D2230/22, F05D2230/234, F05D2230/31, F05D2230/72, F05D2240/35, F05D2260/12, F05D2260/80, F05D2260/83, F05D2270/8041, F23R 3/06, F23R2900/00017, F23R2900/00018, F23R2900/00019, Y02T 50/60, B22F 10/64, B22F 10/40, B22F 10/14, B22F 10/28Filed as RTX Corporation2026-04-06Lawrence A. Binek | pending |
| HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEMB64D 27/33, F02C 7/32, F01D 15/10, F01D 15/12, F02C 7/36, F02K 5/00, F05D2220/323, F05D2220/76, F05D2250/311, F05D2260/40311Filed as RTX Corporation2026-03-30Thomas E. Clark | pending |
| MULTI-LEVEL SEGMENTED MANDREL SYSTEM AND METHOD FOR COMPOSITE SHAPES WITH NEGATIVE DRAFTFiled as RTX CORPORATION2026-03-27JONATHAN E. EHEANDER | pending |
| Additively Manufactured Annular Fuel ManifoldB22F 5/009, F02C 7/22, B33Y 80/00, B22F 10/28, F02C 7/222, F02C 7/224, F05D2230/22, F05D2230/31, F05D2230/53, F23R 3/28, F23R 3/286, F23R 3/346, F23R 3/54Filed as RTX Corporation2026-03-24Lawrence A. Binek | pending |
| ATTACHMENT REGION FOR CMC COMPONENTSF01D 11/02, F01D 11/08, F01D 25/005, F01D 25/243, F05D2220/32, F05D2240/55, F05D2300/20, F05D2300/603, F05D2300/6033, Y02T 50/60Filed as RTX Corporation2026-03-24Carson A. Roy Thill | pending |
| OPEN ROTOR GAS TURBINE ENGINE WITH ADAPTIVE TURBINE CLEARANCE CONTROL SYSTEM AND METHODF01D 11/24, F01D 11/14, F01D 11/20, F02C 6/08, F05D2260/213Filed as RTX Corporation2026-03-23Thomas E. Clark | pending |
| FAST-NA FOR THREAT DETECTION IN HIGH-THROUGHPUT SEQUENCINGG16B 30/00, G16B 40/00, G16B 5/20Filed as RTX BBN Technologies, Inc.2026-03-20Jacob Stuart Michael Beal | pending |
| ARTIFICIAL DIVERSIFICATION APPROACH TO IDENTIFICATION OF CONSERVED SEQUENCESG16B 20/20, G16B 30/00, G16B 30/10, G16B 40/00, G16B 15/20, G16B 40/20, G01N 33/6803, G01N 33/6818Filed as RTX BBN Technologies, Inc.2026-03-17Jacob Beal | pending |
| Flow Assisted Integral Splash PlateB22F 5/009, F23R 3/283, B33Y 10/00, B33Y 80/00, B22F 10/25, B22F 10/28, C22C 1/0433, F02C 7/22, F02C 7/222, F05D2230/30, F23R 3/002, F23R 3/286, F23R 3/346, F23R 3/54, F23R2900/00018Filed as RTX Corporation2026-03-17Lawrence A. Binek | pending |
| BLADE OUTER AIR SEAL (BOAS) ASSEMBLY FOR A GAS TURBINE ENGINEF01D 11/08, F01D 11/24, F01D 25/12, F01D 25/246, F05D2240/11, F05D2240/81, F05D2250/183, F05D2250/28, F05D2250/314, F05D2260/2212, Y02T 50/60Filed as RTX Corporation2026-03-16Gregory A. O'Connor | pending |
| CMC VANE WITH DETUNED PLATFORMF01D 5/282, F01D 5/16, F01D 5/26, F01D 5/284, F01D 9/041, F02C 3/04, F05D2240/80, F05D2260/96, F05D2300/6033, Y02T 50/60Filed as RTX CORPORATION2026-03-13Cheng Gao | pending |
| ENVIRONMENTAL BARRIER COATING AND METHOD OF REPAIRING THE SAMEB05D 5/005, C04B 41/009, B05D 3/12, C04B 35/80, C04B 41/4539, C04B 41/4572, C04B 41/52, C04B 41/53, C04B 41/89, C04B 41/91, C04B2111/00405, C04B2111/00982, C04B2111/72, F01D 5/005, F01D 5/288, F05D2230/80, F05D2230/90, F05D2300/6033, C04B 35/565, C04B 35/584, C04B 41/5024, C04B 41/526, C04B 41/5059, C04B 41/5089Filed as RTX Corporation2026-03-09David A. Litton | pending |
| INSPECTION TECHNIQUES AND COATINGS FACILITATING THE SAMEFiled as RTX CORPORATION2026-03-09ALEX J. SCHNEIDER | pending |
| Piston Seal Ring BypassF01D 11/00, F16J 9/16, F01D 11/003, F01D 11/005, F01D 25/183, F05D2240/55, F05D2240/58, F16J 9/26, F16J 15/164, F16J 15/3488, F16J 15/441, F16J 15/443, F16J 15/54Filed as RTX Corporation2026-03-06Calvin Jay Winder | pending |
| SHARED CRYOGENIC BOTTOMING CYCLEB64D 37/30, F02C 1/007, B64D 27/10, B64D 37/34, F02C 1/08, F02C 3/22, F02C 6/00, F02C 7/22, F02C 7/224, F05D2220/323Filed as RTX CORPORATION2026-03-05Brandon M. Evans | pending |
| COMPONENT MOUNTING AND DRIVE IN A GEARED TURBOFAN ARCHITECTUREF02C 7/36, F02C 7/32, F05D2220/36, F05D2220/76, F05D2260/30, F05D2260/40311Filed as RTX CORPORATION2026-03-04Todd A. Davis | pending |
| BEAD PROTRUSIONS HEAT TRANSFER SURFACE STRUCTURE OF FLUID CONDUITS AND MANIFOLDSF01D 9/065, F02C 7/143, F01D 25/12, F05D2240/126, F05D2250/61, F05D2260/20, F05D2260/208, F05D2260/213, F05D2260/2214, F05D2260/22141Filed as RTX CORPORATION2026-03-02Orin G. Avidane | pending |
| ROBUST RADIO FREQUENCY WAVEGUIDE SYSTEM FOR GAS TURBINE ENGINESH04B 3/52, H04B 3/46Filed as RTX Corporation2026-03-02Sharbel Elias Azzi | pending |
| METHOD FOR RAPID CHARACTERIZATION OF METALLIC POWDERSG01N 21/718, G01N 33/202, G01N 33/0091, G01J 3/443, G01N 21/3563, G01N 21/3581, G01N 21/359, G01N 21/645, G01N 21/65, G01N 21/85, G01N2015/0096, G01N2015/03, G01N2021/4769, G01N2021/845, G01N2201/06113Filed as RTX Corporation2026-03-02David U. Furrer | pending |
| MULTICAST ROUTING ARCHITECTURE FOR SPACE DATA NETWORKSH04L 45/16, H04W 40/12, H04W 40/22Filed as RTX BBN Technologies, Inc.2026-02-27Dylan Joseph Cirimelli-Low | pending |
| TWO PIECE RETRACTABLE ENGINE CENTER BODY FOR BALANCINGF01D 5/027, F01D 5/10, F01D 15/10, F02C 7/32, F02K 3/06, F05D2220/32, F05D2220/76, F05D2240/24, F05D2260/15, F05D2260/31, F05D2260/96Filed as RTX Corporation2026-02-27Nicholas J. Lawliss | pending |
| PHOTONIC INTEGRATED CIRCUITS WITH GUIDED-MODE EXCITATION AND COLLECTION FOR SOLID-STATE SPIN SENSORSG02B 6/12, G02B 6/30, G02B 6/12004, G02B 6/124, G02B 6/136, G02B 6/305, G02B2006/121, G02B2006/12109, G02B2006/12121, G02B2006/12138Filed as RTX BBN Technologies, Inc.2026-02-26Milica Notaros | pending |
| Powder Bed Fusion Build Plates Restoration with Friction Surfacing Additive Manufacturing (FSAM)B22F 12/30, B22F 10/43, B33Y 10/00, B33Y 30/00, B33Y 70/00, B33Y 80/00, B23K 26/342, Y02P 10/25, B33Y 40/20, B33Y 40/10, B22F 10/28, B22F 7/08, B23K 20/1215, B22F2999/00, B22F2207/01Filed as RTX Corporation2026-02-26Lawrence Binek | pending |
| GEARBOX ARRANGEMENT FOR DUAL SPOOL ENGINE ACCESSORIESF01D 25/04, F02C 7/32, F01D 15/10, F01D 25/20, F02C 7/06, F02C 7/36, F02K 3/06, F05D2230/64, F05D2240/40, F05D2240/91, F05D2260/213, F05D2260/4031, F05D2260/96, F05D2260/98Filed as RTX Corporation2026-02-26Thomas E. Clark | pending |
| CMC COMPONENT WITH COOLING CAVITYF01D 11/24, F23R 3/04, B32B 18/00, C04B 35/565, C04B 35/80, C04B2235/5244, C04B2237/365, C04B2237/38, C04B2237/62, F01D 11/08, F01D 25/12, F01D 25/246, F05D2230/54, F05D2240/11, F05D2240/81, F05D2260/201, F05D2260/31, F05D2260/36, F05D2260/38, F05D2300/6033, F23R 3/007Filed as RTX CORPORATION2026-02-25Winston SMIDDY | pending |
| APPARATUS AND METHOD FOR MITIGATING PARTICULATE ACCUMULATION ON A COMPONENT OF A GAS TURBINEF23R 3/002, F23R 3/005, F01D 5/189, F01D 9/065, F01D 25/32, F05D2240/35, F05D2260/201, F05D2260/202, F05D2260/205, F05D2260/607, F23M 5/08, F23R 3/06, F23R2900/00004, F23R2900/03042, F23R2900/03043, F23R2900/03044, Y02T 50/60Filed as RTX Corporation2026-02-24Dennis M. Moura | pending |
| Coating for Aluminum Alloy AerostructuresC25D 11/08, F01D 5/288, B05D 1/02, B05D 7/56, B05D2202/25, B05D2350/00, C23C 24/04, C23C 28/00, C23C 28/04, C23F 11/185, C23F 17/00, C25D 11/246, F01D 9/041, F01D 9/042, F01D 25/007, F04D 29/023, F04D 29/542, F05D2220/3216, F05D2230/31, F05D2230/90, F05D2240/12, F05D2240/123, F05D2240/124, F05D2300/173, F05D2300/40, F05D2300/44, F05D2300/514, F05D2300/611Filed as RTX Corporation2026-02-23Lei Chen | pending |
| FUEL-COOLED ENGINE COMPONENT(S)F01D 25/12, F02C 7/18, F01D 9/065, F01D 11/24, F02C 3/22, F02C 3/24, F02C 7/22, F02C 7/224, F05D2220/323, F05D2240/11, F05D2240/12, F05D2240/36, F05D2260/205, F05D2260/232, F05D2300/11, F05D2300/143, F05D2300/1432, F23R 3/005, F23R 3/283, F23R 3/40, F23R2900/00002Filed as RTX Corporation2026-02-23Dustin W. Davis | pending |
| QUANTUM AND MAGNONIC-BASED MAGNETOMETER DRIVEN WITH AN ULTRALOW PHASE AND AMPLITUDE NOISE OSCILLATORG01R 33/0011, G01R 33/1284, G01R 33/0017, G01R 33/0094, G01R 33/0206, G01R 33/022, G01R 33/032Filed as RTX BBN Technologies, Inc.2026-02-20James Andrew Dervay | pending |
| ROTATING DETONATION TURBINE INTERBURNERF02C 7/00, G01S 17/66Filed as RTX Corporation2026-02-20Steven W. Burd | pending |
| INTEGRAL BRUSH SEAL COVER PLATE AND METHODF01D 11/003, F01D 11/08, F05D2240/11, F05D2240/56, F05D2260/201, F05D2260/202, F05D2300/6033, F16J 15/3288, Y02T 50/60Filed as RTX CORPORATION2026-02-20Christopher PETERSON | pending |
| HYBRID SHROUD IMPELLERF04D 17/02, F04D 29/526, B33Y 80/00, B22F 5/009, F01D 5/048, F01D 5/145, F02C 6/08, F04D 29/284, F04D 29/326, F04D 29/384, F04D 29/4206, F05D2220/3212, F05D2220/3219, F05D2230/22, F05D2230/234, F05D2230/30, F05D2250/183, F05D2250/184Filed as RTX Corporation2026-02-19Parag H. Mathuria | pending |
| ADAPTIVE BLENDING SYSTEM AND METHOD FOR REMOVING RESIDUAL STRESS IN TURBINE ENGINE COMPONENTF01D 5/005, B23P 6/002, B23P 6/045, F05D2230/10, F05D2230/80, G01N 23/20008Filed as RTX CORPORATION2026-02-19Garrett KERNOZICKY | pending |
Filings are matched to the company by applicant name, so a subsidiary filing under its own name is only here if that name resolves to this company. The applicant is printed as filed, which makes a wrong match visible. A patent is not a product: most applications are never granted, and most grants are never built.
More on RTX
Company overviewEverything on RTX in one place, with the price.SEC filingsWhat RTX's 8-Ks say happened: results, departures, auditor changes.Insider tradingWhat RTX's own officers and directors buy and sell.Who owns itEvery manager reporting a position in RTX.Funds holding itWhich funds and ETFs hold RTX, and how big a bet.LobbyingWhat RTX spends lobbying Congress, and on what.Who lobbies for itThe lobbyists on RTX's account, and who they worked for.Federal contractsWhat federal agencies pay RTX.