← Every company
Halliburton Co Patents
What Halliburton Co has filed at the patent office — applications as well as grants, because a filing is on the record eighteen months before anyone has to say what it was for.
HAL on carbonthat →Filings on file
66
Granted
0
Still pending
66
Filed under
3 names
66 filings
Newest filing first. A pending application has no patent number yet, and most never get one.
| Invention | Patent |
|---|---|
| SUPPLY CHAIN QUALITY ASSURANCE FOR WELL COMPLETION USING BLOCKCHAING06F 16/2379, G05B 13/042, E21B 43/2607, G06Q 50/02Filed as Halliburton Energy Services, Inc.2026-06-23Daniel D. GLEITMAN | pending |
| PROCESSING AND JOINT INTERPRETATION USING MULTIPLE BOREHOLE ACOUSTIC WAVES FOR THROUGH TUBING CEMENT EVALUATIONE21B 47/005, G06N 20/00, E21B 47/085, E21B 47/107, E21B2200/22, G01V 1/46, G01V 1/48Filed as Halliburton Energy Services, Inc.2026-06-16Yao GE | pending |
| HYDRAULIC FRACTURING WITH MODULATING INJECTION FLOW RATEE21B 43/2607, E21B 43/267, E21B 43/12, E21B 43/26Filed as Halliburton Energy Services, Inc.2026-06-12Glenn Howard Weightman | pending |
| SPIN-RESISTANT DIFFUSER FOR ELECTRIC SUBMERSIBLE PUMPE21B 43/128, F04D 29/445, F04D 1/06, F04D 13/10, F04D 29/448, F04D 29/628Filed as Halliburton Energy Services, Inc.2026-06-09Andres Chapa | pending |
| VIRTUAL ESP MODEL TO DETECT SYSTEM DEGRADATION FOR PREVENTIVE MAINTENANCEG05B 23/0283, G05B 23/0208, G05B 23/024Filed as Halliburton Energy Services, Inc.2026-06-03Yuzhu Hu | pending |
| MULTI-WELL BLENDING SYSTEME21B 43/2607, B01F 35/7176, B01F 23/59, B01F2101/49, E21B 43/267Filed as Halliburton Energy Services, Inc.2026-05-27Wesley John Warren | pending |
| DENSITY SENSOR FOR QUANTIFYING PRODUCTION FLUID CONTENTE21B 47/10, G01N 9/36, E21B 49/0875, E21B 47/12, G01N 9/14, G01N 9/30, G01N 33/2823Filed as Halliburton Energy Services, Inc.2026-05-26Ibrahim El Mallawany | pending |
| CONTRAST COMPONENT COATING FOR SENSOR ANALYSISE21B 49/0875, E21B 47/135, G01N 33/287, E21B 47/114, E21B 47/017, G01N 31/223, G01N2021/7796Filed as Halliburton Energy Services, Inc.2026-05-22Christopher Michael Jones | pending |
| REAL-TIME MACHINE LEARNING OPTIMIZATION AND AUTOPILOT CONTROL FOR PULSED NEUTRON LOGGING OPERATIONSG01V 5/101, G01V 5/105, H05H 3/06, G01V 5/104Filed as Halliburton Energy Services, Inc.2026-05-15Zilu Zhou | pending |
| PREDICTION BASED PUMP-OFF DETECTIONE21B 47/008, F04B 49/065, E21B2200/20, E21B 23/08, E21B 23/14, E21B 47/12, F04B 15/02, F04B 49/02, F04B 51/00, F04B2207/03Filed as Halliburton Energy Services, Inc.2026-05-13Siyang Song | pending |
| CLEANING DEVICES AND OPERATIONS FOR DOWNHOLE SEPARATION IN A WELLE21B 21/065, E21B 37/00, E21B 21/00, E21B 21/06, E21B 43/12, E21B 43/38, E21B 43/385, E21B 47/10Filed as Halliburton Energy Services, Inc.2026-05-11David J. Steele | pending |
| PETROPHYSICAL INTERPRETATION MODEL CREATION FOR HETEROGENOUS COMPLEX RESERVOIRSE21B 47/005, E21B 25/00, E21B2200/20, E21B2200/22, E21B 47/135, E21B 47/14Filed as Halliburton Energy Services, Inc.2026-05-11Huiwen Sheng | pending |
| RESETTABLE, RETRIEVABLE MULTI-SIZE DONUT SEALE21B 33/1208, E21B 23/01, E21B 33/128Filed as Halliburton Energy Services, Inc.2026-05-08Xue Yuan Siok | pending |
| CALIBRATION METHODS FOR OIL BASED MUD IMAGER TOOLSE21B 47/0025, G06T 7/80, E21B2200/20, E21B 47/138, E21B 47/00Filed as Halliburton Energy Services, Inc.2026-05-08Baris Guner | pending |
| TWO PART MILLING AND RUNNING TOOL EMPLOYING A BODY LOCK RINGE21B 7/06, E21B 7/061, E21B 41/0035, E21B2200/08, E21B2200/05, E21B 10/26, E21B 17/04, E21B 23/01, E21B 29/02, E21B 33/12, E21B 33/129, E21B 34/06, E21B 41/00, E21B 41/0042, E21B 43/12, E21B 43/162Filed as Halliburton Energy Services, Inc.2026-05-06Jamie Revelle Weber | pending |
| SAFETY VALVE EMPLOYING RADIALLY COUPLED MAGNETIC TARGETS AND A MAGNETIC ASSEMBLY AXIALLY COUPLED TO A MAGNETIC TARGETE21B 34/066, E21B 34/10, E21B 23/00, E21B 34/06, E21B 34/08, E21B 34/14, F16K 31/0644, F16K 31/08, F16K 31/082Filed as Halliburton Energy Services, Inc.2026-05-06Mohan Gunasekaran | pending |
| FULLY AUTOMATED PERFORATING GUNE21B 43/11855, E21B 43/119, E21B 17/0426, E21B 43/116, E21B 43/117, E21B 43/1185Filed as Halliburton Energy Services, Inc.2026-05-05Joseph Todd MacGillivray | pending |
| METHOD OF GENERATING ENERGY FROM SEQUESTERED SUPERCRITICAL CARBON DIOXIDEE21B 41/0064, Y02P 90/50, Y02C 20/40, F01D 15/10, F01K 7/32, F01K 25/103, F02C 1/02, F05D2260/611, Y02E 70/30Filed as Halliburton Energy Services, Inc.2026-04-30Ryan W. McChesney | pending |
| METHODS TO DYNAMICALLY CONTROL FLUID FLOW IN A MULTI-WELL SYSTEM, METHODS TO DYNAMICALLY PROVIDE REAL-TIME STATUS OF FLUID FLOW IN A MULTI-WELL SYSTEM, AND MULTI-WELL FLUID FLOW CONTROL SYSTEMSE21B 43/12, E21B2200/20, E21B 41/00Filed as Halliburton Energy Services, Inc.2026-04-20Alejandro Javier Chacon | pending |
| MONITORING WELLBORE FLUIDS USING METAL IONS FROM TRACERSE21B 47/11, E21B 43/267, E21B 49/086, G01N 33/2823, G01N 21/31, G01N 21/66, G01N 33/2835Filed as Halliburton Energy Services, Inc.2026-04-15Michael Linley Fripp | pending |
| HYDRAULIC FRACTURING WITH MODULATING INJECTION FLOW RATEE21B 43/2607Filed as Halliburton Energy Services, Inc.2026-04-15Bruce Carl Lucas | pending |
| WIRELESSLY POWERED AND ACTIVATED ELECTROMAGNETIC TRANSMITTERS BEHIND CASING FOR RESERVOIR MONITORINGE21B 49/00, G01V 3/30, E21B 47/13, E21B 47/12Filed as Halliburton Energy Services, Inc.2026-04-13Ahmed Elsayed FOUDA | pending |
| EXPANDING METAL FOR PLUG AND ABANDONMENTE21B 17/1021, E21B 33/1208, E21B 33/124, E21B 23/06, E21B 33/1204, E21B 33/1212, E21B 33/1277, E21B 33/16Filed as Halliburton Energy Services, Inc.2026-04-10Michael Linley Fripp | pending |
| DOWNHOLE ORIENTING HELIX FOR OPERATIONS REQUIRING MULTIPLE ORIENTING SEQUENCESE21B 23/14, E21B 17/023, E21B 17/10, E21B 17/22, E21B 23/02Filed as Halliburton Energy Services, Inc.2026-04-06Jason P. Witte | pending |
| TRAVEL JOINT WITH TELESCOPING CONTROL LINESE21B 17/07, E21B 17/1035, E21B 23/00Filed as Halliburton Energy Services, Inc.2026-03-31Jorge Arturo Hinostroza Medina | pending |
| LINER HANGER SETTING TOOL INCLUDING A SPIRAL SPLIT RING CONE, A WELL SYSTEM AND A METHODE21B 43/105Filed as Halliburton Energy Services, Inc.2026-03-30Kelvin Chee Sing Loh | pending |
| CEMENT HEALTH MONITORING IN CCUS WELLSE21B 47/005, G01N 33/2817, E21B2200/20, E21B 47/113, G01V 20/00, E21B 34/06, E21B 47/10, E21B 49/08, G01N 21/255, G01N 21/31, G01N2201/129Filed as Halliburton Energy Services, Inc.2026-03-30Jalpan P. Dave | pending |
| LINER HANGER SETTING TOOL INCLUDING A SPLIT RING CONE, A WELL SYSTEM AND A METHODE21B 43/105Filed as Halliburton Energy Services, Inc.2026-03-30Kelvin Chee Sing Loh | pending |
| LINER HANGER SETTING TOOL INCLUDING FIRST AND SECOND CONE ASSEMBLY PORTIONS, A WELL SYSTEM AND A METHODE21B 43/105Filed as Halliburton Energy Services, Inc.2026-03-30Kelvin Chee Sing Loh | pending |
| DOWNHOLE TOOL INCLUDING A PRESSURE INTENSIFIERE21B 23/0421, E21B 23/0411, E21B 23/0412Filed as Halliburton Energy Services, Inc.2026-03-27Yu Zhi Benjamin Wong | pending |
| DOWNHOLE TOOL INCLUDING A SACRIFICIAL CONDUCTIVE PROTECTION LAYER POSITIONED ABOUT A MATERIAL TO BE PROTECTEDE21B 33/1208Filed as Halliburton Energy Services, Inc.2026-03-27Deepesh Upadrashta | pending |
| DOWNHOLE FIBER OPTIC CABLE DESIGNED WITH IMPROVED STRAIN RESPONSE AND DESIGNED FOR LONG LIFE IN THE WELLE21B 47/00, G02B 6/4435, E21B 47/135, G02B 6/443, G02B 6/4488Filed as Halliburton Energy Services, Inc.2026-03-26Michel LeBlanc | pending |
| INTELLIGENT BIT DESIGNG06F 30/27, G06F 30/23, G06F 30/17, G06N 3/09, G06N 3/0464, G06N 3/08Filed as Halliburton Energy Services, Inc.2026-03-24William Brian Atkins | pending |
| Dynamically Engageable Electromechanical BrakeE21B 41/00, F16D 27/108, F16D 63/002, E21B 34/066, F16D 27/112, F16D 65/18, F16D2121/20, F16D2125/582, F16D2127/02Filed as Halliburton Energy Services, Inc.2026-03-20Bruce Edward Scott | pending |
| DOWNHOLE TUBULAR INSPECTION USING PARTIAL-SATURATION EDDY CURRENTSE21B 47/006, E21B 47/0025, E21B 47/0228, G01N 27/904, E21B 47/085, G01N 27/9006, G01V 3/18Filed as Halliburton Energy Services, Inc.2026-03-20Ahmed Elsayed Fouda | pending |
| MITIGATION OF COUPLING NOISE IN DISTRIBUTED ACOUSTIC SENSING (DAS) VERTICAL SEISMIC PROFILING (VSP) DATA USING MACHINE LEARNINGG01V 1/282Filed as Halliburton Energy Services, Inc.2026-03-20Satyan SINGH | pending |
| RETRIEVABLE, BELOW JUNCTION, ESP, AND OTHER DEVICESFiled as HALLIBURTON ENERGY SERVICES, INC.2026-03-12DAVID J. STEELE | pending |
| RETRIEVABLE, BELOW JUNCTION, ESP, AND OTHER DEVICESE21B 41/0042, E21B 43/128, E21B 43/38Filed as Halliburton Energy Services, Inc.2026-03-09David J. Steele | pending |
| CONTINUOUS PUMPING OPERATIONS USING DECOUPLED PUMP MAINTENANCEE21B 43/2607, E21B 43/26, F16L 21/06, F16L 25/009, F16L 37/002, F16L 37/05, F16L 55/1022Filed as Halliburton Energy Services, Inc.2026-02-27Brad Robert Bull | pending |
| SONDE CENTRALIZATION INSIDE A COLLARE21B 17/1007, E21B 47/01, E21B 47/017Filed as Halliburton Energy services, Inc.2026-02-20Lizheng Zhang | pending |
| SONDE CENTRALIZATION INSIDE A COLLARE21B 17/1007, E21B 47/01, E21B 47/017Filed as Halliburton Energy Services, Inc.2026-02-20Lizheng Zhang | pending |
| FORMATION FLUID SAMPLING USING PROBE WITH INFLATABLE PADE21B 49/088, E21B 49/081, E21B 49/10Filed as Halliburton Energy Services, Inc.2026-02-18Bin Dai | pending |
| SELF ACTIVATING SEAL ASSEMBLY BACKUPE21B 33/10, E21B 33/12, E21B 33/1216, F16J 15/002, F16J 15/02, F16J 15/08, F16J 15/164Filed as Halliburton Energy Services, Inc.2026-02-17Shanu Thottungal Eldho | pending |
| DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTORE21B 17/0285, E21B 17/023, H01B 7/29, E21B 40/00, E21B 47/01, E21B 47/12, H01B 7/0009Filed as Halliburton Energy Services, Inc.2026-02-17Louis Francis Lafleur | pending |
| DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONSE21B 7/061, E21B 47/12, E21B 23/001, E21B 4/18, E21B 17/20, E21B 19/16, E21B 19/22, E21B 23/00, E21B 23/01, E21B 23/08, E21B 23/10, E21B 23/14, E21B 47/01Filed as HALLIBURTON ENERGY SERVICES, INC.2026-02-11Christopher Jones | pending |
| DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONSFiled as HALLIBURTON ENERGY SERVICES, INC.2026-02-11CHRISTOPHER JONES | pending |
| DATA-DRIVEN CONSTRAINED MODEL FOR CORROSION INSPECTION TOOLSE21B 47/006, G01V 3/26Filed as Halliburton Energy Services, Inc.2026-02-09Ahmed E. Fouda | pending |
| FLOWBACK SUB FOR AICDS AND DAICDSFiled as HALLIBURTON ENERGY SERVICES, INC.2026-02-06IBRAHIM EL MALLAWANY | pending |
| PREDICTIVE PUMP MAINTENANCE BASED UPON UTILIZATION AND OPERATING CONDITIONSE21B 47/008, E21B 33/13, E21B 41/00, E21B 43/12, G06N 20/00, E21B2200/20, E21B2200/22, G06F 18/214, F04B 49/065, F04B 51/00, F04B2201/0403, F04B2205/04, F04B2205/09, F04B2207/03, F04B2207/043Filed as Halliburton Energy Services, Inc.2026-01-27Charles E. NEAL III | pending |
| COMPLIANT SCREEN WITH FLOW RESTRICTIVE PORTIONS TO REDUCE CROSS FLOW OF WELLBORE FLUIDSE21B 43/084, E21B 43/108, E21B 43/08Filed as Halliburton Energy Services, Inc.2026-01-26Gordon McLEARY | pending |
| TUBING OR CASING CONVEYED FLUID SAMPLING SYSTEMFiled as HALLIBURTON ENERGY SERVICES, INC.2026-01-26JACOB ANTHONY STIEBEL | pending |
| TUBING OR CASING CONVEYED FLUID SAMPLING SYSTEME21B 43/116, E21B 43/119, E21B 17/042, E21B 17/07, E21B 34/103, E21B 43/11, E21B 43/117, E21B 43/11852, E21B 49/00, E21B 49/08Filed as Halliburton Energy Services, Inc.2026-01-20Jacob Anthony Stiebel | pending |
| PRESSURE INTENSIFIER MODULE FOR ADDITIONAL SETTING FORCE IN A RETRIEVABLE BRIDGE PLUGE21B 23/042, E21B 23/06, E21B 33/1285Filed as Halliburton Energy Services, Inc.2026-01-19Jalpan P. Dave | pending |
| USING PRESSURE GAUGES TO ESTABLISH LOW FREQUENCY DISTRIBUTED ACOUSTIC SENSING RESPONSES ASSOCIATED WITH PRESSURE FIELD CHANGES IN OFFSET WELLSE21B 43/26, E21B 47/06, E21B2200/20, E21B2200/22Filed as Halliburton Energy Services, Inc.2026-01-19Ronald Glen Dusterhoft | pending |
| TUBING OR CASING CONVEYED FLUID SAMPLING SYSTEMFiled as HALLIBURTON ENERGY SERVICES, INC.2026-01-19JACOB ANTHONY STIEBEL | pending |
| FORMATION PERMEABILITY ANISOTROPY MEASUREMENT BY INJECTING THEN PUMPING OF INJECTION FLUIDE21B 49/10, E21B 47/11, E21B 49/008Filed as Halliburton Energy Services, Inc.2026-01-15Bin DAI | pending |
| LARGE COUNT MICROSAMPLERE21B 49/0875, E21B 49/081, G01N 1/08, E21B2200/20, E21B2200/22, E21B 49/08, E21B 49/088, E21B 49/10, G01N2001/1031Filed as Halliburton Energy Services, Inc.2026-01-14Christopher Michael Jones | pending |
| FILTER CAKE REMOVAL COMPOSITIONS AND RELATED WELLBORE METHODSC09K 8/528, E21B 37/06, E21B2200/08, C09K 8/52, C09K2208/26Filed as Halliburton Energy Services, Inc.2026-01-14Ravikant S. Belakshe | pending |
| CLASSIFICATION OF PORE OR GRAIN TYPES IN FORMATION SAMPLES FROM A SUBTERRANEAN FORMATIONE21B 47/0025, G01N 33/241, G06N 20/00, E21B2200/22, G06V 20/64, G06V 10/44, G06V 10/764, G06N 3/045, E21B 49/02, G01N 15/02, G01N 15/08, G01N 21/00, G01N 23/00, G01V 1/306, G01V 1/50, G01V 3/18, G01V 3/32, G01V 11/00, G01V2210/6244, G06T 7/0004, G06T2207/00, G06T2207/20081, G06T2207/30181Filed as Halliburton Energy Services, Inc.2026-01-14Andre de Almeida Maximo | pending |
| METHODS OF SERVICING A WELLBORE WITH COMPOSITIONS COMPRISING A SUSPENSION OF METAL OXIDE AND A SALT SOLUTIONC09K 8/467, E21B 33/138, E21B 21/003Filed as Halliburton Energy Services, Inc.2026-01-09Paul J. Jones | pending |
| IDENTIFYING ASPHALTENE PRECIPITATION AND AGGREGATION WITH A FORMATION TESTING AND SAMPLING TOOLE21B 49/08, E21B 49/087, E21B 49/10, E21B 47/06Filed as Halliburton Energy Services, Inc.2026-01-08Rohin Naveena-Chandran | pending |
| TUBING OR CASING CONVEYED FLUID SAMPLING SYSTEME21B 49/08, E21B 49/088, E21B 34/16, E21B 43/11, E21B 43/116, E21B 43/117, E21B 49/081, E21B 49/082, E21B 49/10Filed as Halliburton Energy Services, Inc.2026-01-07Jacob Anthony Stiebel | pending |
| INTERACTIVE AND SMART WORKFLOW TO MEASURE NOISE FREE FORMATION PRESSURE AND CHARACTERIZE SUPERCHARGE IN FORMATION TESTINGE21B 47/18, E21B 49/00, E21B 47/06, E21B 49/10Filed as Halliburton Energy Services, Inc.2026-01-07Mehdi Ali Pour Kallehbasti | pending |
| NEUTRON ABSORBING DOPANT FOR REDUCING BOREHOLE FLUID BACKGROUND IN GEOCHEMICAL LOGGINGG01V 5/101, G01V 5/102, E21B 47/12, G01V 5/145Filed as Halliburton Energy Services, Inc.2026-01-05Gregory Joseph Schmid | pending |
| METHOD AND APPARATUS FOR DOWNHOLE FLUID MICROSAMPLE COLLECTION WITH STAGED HYDRAULIC ACTUATIONE21B 34/066, E21B 49/081, E21B2200/22, F15B 1/04, F15B 13/024Filed as Halliburton Energy Services, Inc.2026-01-05Christian Reding | pending |
| PRODUCTION WELLBORE DEFLECTOR-LESS MULTILATERAL SYSTEM USING A GUIDANCE SUBE21B 7/04, E21B 23/00, E21B 41/00, E21B 41/0035, E21D 9/00, F16L 1/028Filed as Halliburton Energy Services, Inc.2026-01-05Jacob Dale Ford | pending |
Filings are matched to the company by applicant name, so a subsidiary filing under its own name is only here if that name resolves to this company. The applicant is printed as filed, which makes a wrong match visible. A patent is not a product: most applications are never granted, and most grants are never built.
More on HAL
Company overviewEverything on HAL in one place, with the price.SEC filingsWhat HAL's 8-Ks say happened: results, departures, auditor changes.Insider tradingWhat HAL's own officers and directors buy and sell.Who owns itEvery manager reporting a position in HAL.Funds holding itWhich funds and ETFs hold HAL, and how big a bet.LobbyingWhat HAL spends lobbying Congress, and on what.Who lobbies for itThe lobbyists on HAL's account, and who they worked for.Federal contractsWhat federal agencies pay HAL.Workplace safetyWhat OSHA found at HAL's sites.