← Every company
General Electric Co Patents
What General Electric Co has filed at the patent office — applications as well as grants, because a filing is on the record eighteen months before anyone has to say what it was for.
GE on carbonthat →Filings on file
72
Granted
0
Still pending
72
Filed under
3 names
72 filings
Newest filing first. A pending application has no patent number yet, and most never get one.
| Invention | Patent |
|---|---|
| SYSTEMS AND METHODS FOR ADDITIVE MANUFACTURING USING PIXEL SHIFTINGB29C 64/124, B29C 64/188, B33Y 10/00, B33Y 30/00, B33Y 50/02, B29C 64/264, B29C 64/282, B29C 64/393, B29C 64/286, B29C 64/268Filed as General Electric Company2026-06-18Mary Kathryn Thompson | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMF01D 7/00, B64D 27/10, F05D2220/323, F05D2220/36, F05D2260/70Filed as General Electric Company2026-06-18Randy M. Vondrell | pending |
| VARIABLE BLEED VALVE ASSEMBLIESF02C 3/13, F02C 9/20, F01D 17/105, F02C 6/08, F02C 9/18, F04D 27/0215, F04D 27/023, F04D 29/663, F04D 29/664, F04D 29/665, F05D2260/96, F05D2260/963, F16K 37/0025, F16K 47/02Filed as General Electric Company2026-06-17Nageswar Rao Ganji | pending |
| AIRCRAFT WITH AN UNDUCTED FAN PROPULSORB64D 27/02, B64C 11/48Filed as General Electric Company2026-06-12Sara Elizabeth Carle | pending |
| GAS TURBINE ENGINE HAVING COOLING SYSTEMSF02C 7/185, F02C 6/08, F02C 7/18, F02C 9/18, F02K 3/06, F05D2220/323, F05D2260/213, Y02T 50/60Filed as General Electric Company2026-06-12Brandon Wayne Miller | pending |
| GAS TURBINE ENGINE HAVING COOLING SYSTEMSF02C 7/12, F02C 6/08, F02C 7/042, F02C 7/18, F02C 7/185, F02C 9/18, F05D2260/213, Y02T 50/60Filed as General Electric Company2026-06-10Brandon Wayne Miller | pending |
| COUPLING ASSEMBLY FOR A TURBINE ENGINEF02C 7/20, F23R 3/60, F02K 1/82, F02K 1/822, F23R 3/002, F23R 3/007, F23R 3/06, F23R2900/00017, F23R2900/03042Filed as General Electric Company2026-06-04Ravindra Shankar Ganiger | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMF01D 7/00, B64D 27/10, F01D 25/16, F05D2220/36, F05D2240/54Filed as General Electric Company2026-06-04Randy M. Vondrell | pending |
| TURBINE ENGINE INCLUDING A COMBUSTORF23R 3/286, F23R 3/34, F23R 3/42, F02C 3/14, F23R 3/002, F23R 3/12, F23R 3/343, F23R 3/346, F23R 3/50, F23R2900/00015Filed as General Electric Company2026-06-04Hiranya Nath | pending |
| AIRCRAFT WITH AN UNDUCTED FAN PROPULSORB64D 27/02, B64C 11/48Filed as General Electric Company2026-05-29Sara Elizabeth Carle | pending |
| AIRCRAFT WITH AN UNDUCTED FAN PROPULSORB64C 3/32, B64D 27/18, B64D 27/402, B64C 11/48, B64D 27/12, B64D2027/005Filed as General Electric Company2026-05-29Sara Elizabeth Carle | pending |
| GAS TURBINE ENGINEF01D 5/081, F01D 5/143, F01D 5/146, F02C 6/08, F02C 7/185, F02C 9/28, F02K 3/02, F02K 3/025, F02K 3/06, F02K 3/077, F04D 29/324, F05D2220/32, F05D2220/3218, F05D2220/3219, F05D2240/30, F05D2260/213, Y02T 50/60Filed as General Electric Company2026-05-29Daniel Alan Niergarth | pending |
| CRYOGENIC FUEL DISTRIBUTION SYSTEMS INCLUDING HEAT EXCHANGERS AND RELATED METHODSF02C 7/14, F02C 3/22, F02C 7/224, F02C 7/232, F05D2260/213Filed as General Electric Company2026-05-28Mirko Gernone | pending |
| MATERIAL SUPPLY SYSTEMS FOR ADDITIVE MANUFACTURING AND METHODS FOR USING THE SAMEB33Y 30/00, B29C 64/329, B33Y 10/00, B33Y 40/00, Y02P 10/25, B29C 64/357, B29C 64/153, B29C 64/343, B29C 64/165, B29C 64/205, B22F 10/00, B22F 12/57, B22F 12/60, B22F 12/52Filed as General Electric Company2026-05-27Carlos H. Bonilla | pending |
| AERO-ACOUSTICALLY DAMPENED BLEED VALVEF01D 17/12, F02C 9/18, F04D 27/0215, F01D 9/04, F01D 17/105, F01D 17/141, F02C 6/08, F02C 7/052, F04D 27/023, F05D2250/183, F05D2250/184, F05D2250/191, F05D2250/42, F05D2260/96, Y02T 50/60Filed as General Electric Company2026-05-27Thomas Malkus | pending |
| GAS TURBINE ENGINEB64D 27/12, F02C 7/32, F02C 7/20, F02K 3/06Filed as General Electric Company2026-05-22Daniel John Oehrle | pending |
| METHODS AND APPARATUS FOR MANAGING A HYDROGEN STORAGE AND DISTRIBUTION SYSTEMG16C 20/70, F17C 13/02, G01M 3/186, F17C 13/00, F17C 13/023, F17C 13/12, F17C2221/012, F17C2250/032, F17C2250/0404, F17C2250/0443, F17C2250/0452, F17C2250/0694, F17C2250/07, F17C2260/044, F17C2265/06, G01M 3/226, G01M 3/26, G01M 3/3254Filed as General Electric Company2026-05-22Constantinos Minas | pending |
| GAS TURBINE ENGINEB64D 27/12, F02C 7/32Filed as General Electric Company2026-05-22Daniel John Oehrle | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F01D 7/00, B64D2027/005, F01D 25/16, F02K 3/025, F02K 3/06, F04D 19/002, F04D 29/059, F04D 29/362, F05D2220/323, F05D2220/36, F05D2240/50, F05D2240/54, F05D2260/79Filed as General Electric Company2026-05-21Randy M. Vondrell | pending |
| COMBUSTOR SIZE RATING FOR A GAS TURBINE ENGINE USING HYDROGEN FUELF02C 7/22, F23R 3/50, F02C 3/20, F23R 3/28, F23R 3/286, F23R 3/42, F23R2900/00002Filed as General Electric Company2026-05-21Michael A. Benjamin | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMF04D 29/362, F02C 3/06, F05D2220/323, F05D2220/36, F05D2260/15, F05D2260/74, F05D2260/79, F05D2270/64Filed as General Electric Company2026-05-21Randy M. Vondrell | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMF04D 29/362, F02C 3/06, F05D2220/323, F05D2220/36, F05D2260/15, F05D2260/74, F05D2260/79, F05D2270/64Filed as General Electric Company2026-05-21Randy M. Vondrell | pending |
| HYBRID-ELECTRIC PROPULSION SYSTEM EQUIPPED WITH A COUPLER FOR SWITCHING BETWEEN MODES OF OPERATIONB64D 27/02, F02K 5/00, B64D 35/024, B64D 27/33, B64D 27/026, B64D 27/31, B64D 35/023, B64D 31/18, B64D 27/10, B64D 31/00, F01D 15/10, F01D 15/12, F02C 3/103, F02C 3/107, F02C 7/36, F02C 9/56, F05D2220/323, F05D2220/76, F05D2240/40, F05D2260/4023, F05D2270/052, F05D2270/06, F05D2270/07, F05D2270/335, F05D2270/44, F05D2270/62, Y02T 50/60Filed as General Electric Company2026-05-20Darek Tomasz Zatorski | pending |
| HYDROGEN COMBUSTION CONTROL SYSTEM FOR A VEHICLE HAVING A TURBINE ENGINEF02C 3/22, F02C 9/40, F02C 7/22, F02C 7/266, F02C 9/00, F02C 9/263, F02C 9/48, F05D2260/80Filed as General Electric Company2026-05-19Mr. Arthur William Sibbach | pending |
| BLENDED WING AIRCRAFTB64C 39/10, B64D 27/18, B64C 21/01, B64C 1/16, B64C 3/10, B64C 3/16, B64C 39/08, B64C2001/0045, B64C2039/105, B64D 27/12, B64D 27/14, B64D 27/20, B64D 33/02, B64D2033/022Filed as General Electric Company2026-05-19Arthur William Sibbach | pending |
| COOLING FLUID CONTROL SYSTEM AND METHODS OF OPERATING A COOLING FLUID SYSTEM FOR A TURBINE ENGINEF02C 7/12, F02C 7/16, F02C 9/28, F23R 3/002, F23R 3/283, Y02T 50/60Filed as General Electric Company2026-05-19Hiranya Nath | pending |
| AIRCRAFT WITH AN UNDUCTED FAN PROPULSORB64C 3/32, B64D 27/12, B64D 27/40, B64C 11/48, B64D 27/18, B64D2027/005, F02C 6/00, F05D2220/36Filed as General Electric Company2026-05-15Sara Elizabeth Carle | pending |
| SLURRY-BASED METHODS FOR FORMING A BOND COAT AND ARTICLES FORMED BY THE METHODSC04B 41/009, C04B 41/5024, C04B 41/5096, C04B 41/52, C04B 41/86, C04B 41/89, F01D 5/005, F01D 5/288, F01D 25/005, F05D2220/32, F05D2230/41, F05D2230/80, F05D2230/90, F05D2300/222, F05D2300/5023, F05D2300/6033, F05D2300/611, C04B 35/565, C04B 35/806, C04B 41/4519, C04B 41/4539, C04B 41/5006, C04B 41/5071, C04B2103/0021Filed as General Electric Company2026-05-14Atanu Saha | pending |
| FUEL INJECTOR FOR A GAS TURBINE ENGINEF23R 3/14, F23R 3/286, F23R 3/002Filed as General Electric Company2026-05-08Pabitra Badhuk | pending |
| GAS TURBINE ENGINE WITH ACOUSTIC SPACING OF THE FAN BLADES AND OUTLET GUIDE VANESF02K 3/06, F04D 29/667, F01D 5/10, F01D 5/141, F01D 5/16, F01D 5/282, F01D 9/041, F02C 3/107, F02C 7/045, F02C 7/24, F02C 7/36, F02K 3/04, F04D 29/666, F05D2220/36, F05D2240/12, F05D2260/96, F05D2300/603, Y02T 50/60Filed as General Electric Company2026-05-05Brandon Wayne Miller | pending |
| METHOD OF MANUFACTURING A WOVEN FABRIC FOR A COMPOSITE COMPONENT FOR A TURBINE ENGINED03D 25/005, D03D 15/283, D03D 15/267, D03D 15/275, D03D 15/25, B29B 11/16, B29C 70/24, B29C 70/72, B29L2031/082, D03D 11/02, D10B2101/20, D10B2331/021, D10B2505/02Filed as General Electric Company2026-05-04Mingchao Wang | pending |
| METHODS AND APPARATUS FOR LEAK DETECTION AND MITIGATION FOR HYDROGEN FUELED AIRCRAFTB64D 37/30, B64D 37/32, G01M 3/16Filed as General Electric Company2026-05-04Constantinos Minas | pending |
| GAS TURBINE ENGINEF02K 3/065, F02C 3/06, F02K 3/06, F02K 3/077, Y02T 50/60Filed as General Electric Company2026-05-04Brandon Wayne Miller | pending |
| INSPECTION SYSTEM AND METHOD FOR DETERMINING THE MICROSTRUCTURE FOR A COATINGG01N 21/8422, G01N 22/00, G01N 21/21, G01N 21/3581, G01N2021/8427Filed as General Electric Company2026-05-01Aditya Kulkarni | pending |
| AIRCRAFT WITH AN UNDUCTED FAN PROPULSORB64C 3/32, B64D 27/12, B64D 27/402, B64C 5/02, B64C 9/16, B64C 11/001, B64C 11/06, B64C 11/30, B64C 11/32, B64C 11/38, B64C 29/0025, B64C 29/0033, B64D2027/005Filed as General Electric Company2026-05-01Sara Elizabeth Carle | pending |
| PROPULSION ENGINE AND COWLB64D 29/00, F02C 7/20, B64D 27/406, B64D 27/40, B64D 27/10, B64D 29/02, B64D 29/06, F05D2240/14, F05D2260/50Filed as General Electric Company2026-05-01Peeyush Pankaj | pending |
| MATERIAL SYSTEMS FOR REPAIR OF THERMAL BARRIER COATING AND METHODS THEREOFC04B 35/66, F01D 5/005, F01D 5/288, C04B 35/01, C04B 35/04, C04B 35/10, C04B 35/12, C04B 35/14, C04B 35/46, C04B 35/48, C04B 35/62222, C04B 35/62625, C04B 35/632, C04B 41/009, C04B 41/52, C04B 41/89, C04B 41/90, C04B2111/00405, C04B2111/00982, C04B2235/3246, C04B2235/3279, C04B2235/401, C04B2235/402, C04B2235/404, C04B2235/405, C04B2235/428, C04B2235/483, C04B2235/9607, C23C 26/00, C23C 28/3215, C23C 28/345, C23C 28/3455, F01D 5/282, F01D 5/284, F01D 25/007, F05D2230/31, F05D2230/40, F05D2230/72, F05D2230/80, F05D2230/90, F05D2300/143, F05D2300/182, F05D2300/21, F05D2300/211, F05D2300/2112, F05D2300/2118, F05D2300/2285, F05D2300/5021, F05D2300/6033, F05D2300/611, C04B 35/80, C04B 41/51, C04B 41/457, C04B 41/4539, C04B 41/5031, C04B 41/5155, C04B 41/5042, C04B 41/5096, C04B 41/522, C04B 35/00Filed as General Electric Company2026-05-01Atanu Saha | pending |
| GAS TURBINE ENGINEF02C 7/32, B64D 27/12, F02C 7/14, F02C 7/224, F02K 3/06, Y02T 50/60Filed as General Electric Company2026-04-30Daniel John Oehrle | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F04D 29/362, B64C 11/06, B64D 27/16, B64D2027/005, F02K 3/02, F02K 3/06, F04D 19/002, F04D 29/059, F04D 29/662, F05D2200/13, F05D2200/14, F05D2220/323, F05D2220/36, F05D2240/50, F05D2260/79Filed as General Electric Company2026-04-29Randy M. Vondrell | pending |
| GAS TURBINE ENGINEF02C 7/32, B64D 27/12, F02C 6/08Filed as General Electric Company2026-04-28Daniel John Oehrle | pending |
| FLOATING SEAL ASSEMBLY FOR A TURBINE ENGINEF01D 11/025, F02C 7/28, F01D 11/001, F01D 11/003, F01D 11/005, F02C 3/04, F02C 7/00, F05D2220/32, F05D2240/55Filed as General Electric Company2026-04-28Rahul Anil Bidkar | pending |
| GAS TURBINE ENGINE WITH ACOUSTIC SPACING OF THE FAN BLADES AND OUTLET GUIDE VANESF02K 3/06, F04D 29/666, F01D 5/141, F01D 5/282, F02C 7/045, F02C 7/24, F05D2220/36, F05D2240/12, F05D2260/96, F05D2300/603, Y02T 50/60Filed as General Electric Company2026-04-27Brandon Wayne Miller | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F04D 29/323, B64D2027/005, F02K 3/02, F02K 3/025, F02K 3/06, F04D 19/00, F04D 19/002, F04D 29/059, F04D 29/362, F05D2220/323, F05D2220/36, F05D2260/50, Y02T 50/60Filed as General Electric Company2026-04-24Randy M. Vondrell | pending |
| VARIABLE FLOWPATH CASINGS FOR BLADE TIP CLEARANCE CONTROLF01D 11/22, F04D 29/522, F02C 7/057, F02K 3/06, F04D 27/002, F04D 29/526, F05D2220/32, F05D2220/36, F05D2240/55Filed as General Electric Company2026-04-24Raghuveer Chinta | pending |
| GAS TURBINE ENGINEB64D 27/12, F02C 7/32, F02C 7/20, F02K 3/06, Y02T 50/60Filed as General Electric Company2026-04-24Daniel John Oehrle | pending |
| AIRFOILS FOR GAS TURBINE ENGINESF01D 5/141, F01D 21/045, F05D2240/301, F05D2240/303, F05D2240/304, F05D2240/307, F05D2300/133, Y02T 50/60Filed as General Electric Deutschland Holding GmbH2026-04-23Rodrigo Rodriguez Erdmenger | pending |
| SYSTEMS AND METHODS OF AUTOMATIC FILM REMOVALB26D 3/282, B29C 70/54, B65B 69/00, Y10T 156/1132, Y10T 156/1179, Y10T 156/1944, Y10T 156/1989, B32B 43/006Filed as General Electric Company2026-04-23Shatil Sinha | pending |
| ADDITIVE MANUFACTURING PART MARKING SYSTEM AND PROCESSB22F 10/80, B33Y 10/00, B33Y 50/00, B22F 10/39, B22F 10/28, G06T 9/00Filed as General Electric Company2026-04-22John Bryan Pourcho | pending |
| RECOAT ASSEMBLIES INCLUDING POWDER CONTAINMENT MECHANISMS AND ADDITIVE MANUFACTURING SYSTEMS INCLUDING SAMEB29C 64/218, B22F 12/63, B33Y 10/00, B33Y 30/00, B29C 64/307, B29C 64/153, B29C 64/165, B22F 10/14, B22F 10/28, B22F2999/00, B22F 12/60, B22F 12/38Filed as General Electric Company2026-04-21Vadim Bromberg | pending |
| ROTARY MACHINE SEAL HAVING A WEAR PROTECTION ASSEMBLY WITH AN ABRADABLE COVERINGF01D 11/00, F01D 11/001, F01D 25/00, F02C 7/28, F05D2220/32, F16J 15/3284, F16J 15/342, F16J 15/38Filed as General Electric Company2026-04-13Narendra Anand Hardikar | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F04D 29/323, B64D2027/005, F01D 15/12, F02K 3/02, F02K 3/025, F02K 3/06, F04D 19/00, F04D 19/002, F04D 29/059, F04D 29/362, F05D2200/13, F05D2200/14, F05D2220/323, F05D2220/36, F05D2240/50, F05D2260/40311, F05D2260/406, F05D2260/74, F05D2260/79Filed as General Electric Company2026-04-10Randy M. Vondrell | pending |
| ACTUATOR ASSEMBLIES FOR ADDITIVE MANUFACTURING APPARATUSES AND METHODS FOR USING THE SAMEB29C 64/209, B29C 64/165, B33Y 10/00, B33Y 30/00, B33Y 40/00, B33Y 50/00, B33Y 50/02, B29C 64/214, B29C 64/357, B29C 64/245, B29C 64/386, B29C 64/20, B29C 64/393, B29C 64/227, B29C 64/236, B29C 64/35, B29C 64/218, B29C 64/25, B22F 10/31, B22F 10/14, B22F 12/53, B22F 12/67, B22F 12/90, B22F 12/13, B22F 12/63, B22F 12/52, B22F 12/224, B28B 1/001Filed as General Electric Company2026-04-08Carlos H. Bonilla | pending |
| TURBINE ENGINE HAVING A COMBUSTION SECTION WITH A FUEL NOZZLEF23R 3/14, F23R 3/286, F23R 3/38, F23R 3/283, F23R 3/30, F23R 3/36, F23R2900/00002Filed as General Electric Company2026-04-07Pradeep Naik | pending |
| TURBINE ENGINE WITH COMPOSITE AIRFOILSF01D 5/282, F01D 25/005, F01D 5/147, F01D 9/02, F01D 21/045, F01D 25/243, F05D2220/323, F05D2240/121, F05D2240/303, F05D2300/603, Y02T 50/60Filed as GENERAL ELECTRIC COMPANY2026-04-07Nicholas Joseph Kray | pending |
| PREMIXER ARRAYF23R 3/286, F23R 3/12, F23R 3/343, F23R 3/36, F23R 3/50, F23R2900/03043Filed as General Electric Company2026-04-06Pradeep Naik | pending |
| GAS TURBINE ENGINEF02C 7/32, B64D 27/12, F02C 7/047, F02C 7/20, Y02T 50/60Filed as General Electric Company2026-04-03Daniel John Oehrle | pending |
| SEAL ASSEMBLY FOR A GAS TURBINE ENGINEF01D 11/001, F01D 11/08, F01D 25/16, F05D2220/32, F05D2240/50, F05D2240/55Filed as General Electric Company2026-03-31Narendra Anand Hardikar | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMF01D 5/147, F01D 7/00, F01D 5/021, F01D 5/282, F01D 25/16, F05D2220/36, F05D2240/303, F05D2240/54, F05D2300/603, Y02T 50/60Filed as General Electric Company2026-03-27Randy M. Vondrell | pending |
| AUTOMATED FIBER PLACEMENT ASSEMBLY WITH PRESSURE ROLLERB29C 70/382, B29C 70/384, B28B 23/0056, B29C 70/34, B29C 70/388, B29C 70/443, B29L2031/085Filed as General Electric Company2026-03-26Arthur William Sibbach | pending |
| GAS TURBINE ENGINE WITH FORWARD SWEPT OUTLET GUIDE VANESF01D 25/162, F02C 3/04, F02K 3/068, B64D2033/0206, B64D2033/0286, F01D 5/141, F01D 5/145, F01D 9/02, F01D 9/041, F02C 3/107, F02C 7/04, F02C 7/045, F02C 7/24, F02K 1/827, F02K 3/025, F02K 3/04, F02K 3/06, F04D 29/663, F04D 29/664, F04D 29/666, F05D2220/36, F05D2240/12, F05D2250/38, F05D2260/14, F05D2260/4031, F05D2260/40311, F05D2260/96, F05D2260/961Filed as General Electric Company2026-03-26Brandon Wayne Miller | pending |
| GAS TURBINE ENGINE COMBUSTOR WITH A SET OF DILUTION PASSAGESF23R 3/04, F23R 3/06, F23R 3/28, F23R 3/10, F23R2900/03041Filed as GENERAL ELECTRIC COMPANY2026-03-24Pabitra Badhuk | pending |
| GAS TURBINE ENGINE HAVING COMPOSITE FAN BLADESF02C 7/36, F02C 3/107, F02C 7/06, F02C 7/14, F02K 3/06, F05D2220/36, F05D2260/4031, Y02T 50/60Filed as General Electric Company2026-03-20Arthur William Sibbach | pending |
| GAS TURBINE ENGINE HAVING COMPOSITE FAN BLADESF02C 7/36, F02K 3/06, F02C 3/107, F05D2220/36, F05D2260/4031, Y02T 50/60Filed as General Electric Company2026-03-20Arthur William Sibbach | pending |
| UNDUCTED PROPULSION SYSTEMB64D 27/00, F02C 3/067, B64C 7/02, B64C 30/00, B64D 29/00, B64D 33/04, B64D2027/005, B64D2033/0286, B64D2033/0293, F01D 5/143, F01D 5/145, F02C 6/206, F05D2220/325, F05D2250/20, F05D2250/71, F05D2270/17, Y02T 50/60Filed as General Electric Company2026-03-19Syed Arif Khalid | pending |
| METHODS AND APPARATUS FOR COATING FIBERSB28B 11/04, C04B 35/62884, C23C 16/545, B05D 1/18, B28B 19/0092, B28B 23/043, C04B 35/565, C04B 35/80, C04B2235/5244, C04B2235/616, C23C 16/458, C23C 16/4581, C23C 16/52, C23C 16/54Filed as General Electric Company2026-03-17Guido Teti | pending |
| GAS TURBINE ENGINE WITH THIRD STREAMF02C 3/06, F02K 3/065, F02C 7/04, F02K 3/06Filed as General Electric Company2026-03-16Brandon Wayne Miller | pending |
| HEAT EXCHANGER ASSEMBLY CONFIGURATION FOR A GAS TURBINE ENGINEF01D 9/065, F01D 25/12, F01D 9/041, F01D 25/162, F01D 25/24, F05D2260/20, Y02T 50/60Filed as General Electric Company2026-03-16Hojjat Nasr | pending |
| METHOD OF HEAT-TREATING ADDITIVELY MANUFACTURED FERROMAGNETIC COMPONENTSB22F 5/00, H02K 1/02, B33Y 10/00, B33Y 70/00, B33Y 80/00, Y02P 10/25, B33Y 40/20, B22F 10/00, B22F 10/64, B22F 12/00, B22F 10/50, B22F 10/25, B22F 10/38, B22F 10/364, B22F 10/28, B22F 3/24, B22F2003/248, B22F2005/004, B22F2301/35, B22F2998/10, B22F2999/00, C21D 1/26, C21D 6/007, C21D 9/02, C21D2201/00, C22C 19/07, C22C 33/0285, C22C 38/10, C22C2202/02, H01F 1/20, H01F 3/08, H01F 41/04, H02K 7/003, H02K 15/00, H02K 15/02, H02K 15/12Filed as General Electric Company2026-03-13Francis Johnson | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F01D 7/00, B64C 11/38, B64D2027/005, F01D 25/16, F02K 3/02, F02K 3/06, F04D 19/002, F04D 29/059, F04D 29/362, F05D2220/36, F05D2240/54, F05D2260/74, F05D2260/79Filed as General Electric Company2026-03-13Randy M. Vondrell | pending |
| TURBOFAN ENGINE INCLUDING A FAN ACTUATION SYSTEMB64C 11/385, F04D 29/362, B64C 11/38, B64D2027/005, F01D 7/00, F04D 29/662, F05D2200/13, F05D2200/14, F05D2220/323, F05D2220/36, F05D2260/74, F05D2260/79, F05D2270/64Filed as General Electric Company2026-03-13Randy M. Vondrell | pending |
| STACKED POWER MODULES AND METHOD OF MANUFACTURINGH10D 80/251, H10W 90/10, H10W 90/291, H10W 90/701, H10W 70/099, H10W 72/823, H10W 90/811, H10W 90/00, H10W 40/259, H10W 70/023, H10W 90/22, H10W 90/401, H10W 40/233, H10W 42/80, H10W 70/692, H10W 74/111, H10W 40/037, H10W 42/20, H10W 90/288, H10W 90/734, H10W 70/479, H10W 70/611Filed as General Electric Company2026-03-12Arun Virupaksha Gowda | pending |
| STACKED BACK-TO-BACK POWER MODULES AND METHOD OF MANUFACTURINGH10D 80/251, H10W 90/10, H10W 90/291, H10W 90/701, H10W 70/099, H10W 72/823, H10W 90/811, H10W 90/00, H10W 40/259, H10W 70/023, H10W 90/22, H10W 90/401, H10W 40/233, H10W 42/80, H10W 70/692, H10W 74/111, H10W 40/037, H10W 42/20, H10W 90/288, H10W 90/734, H10W 70/479, H10W 70/611Filed as General Electric Company2026-03-12Arun Virupaksha Gowda | pending |
Filings are matched to the company by applicant name, so a subsidiary filing under its own name is only here if that name resolves to this company. The applicant is printed as filed, which makes a wrong match visible. A patent is not a product: most applications are never granted, and most grants are never built.
More on GE
Company overviewEverything on GE in one place, with the price.SEC filingsWhat GE's 8-Ks say happened: results, departures, auditor changes.Insider tradingWhat GE's own officers and directors buy and sell.Who owns itEvery manager reporting a position in GE.Funds holding itWhich funds and ETFs hold GE, and how big a bet.LobbyingWhat GE spends lobbying Congress, and on what.Who lobbies for itThe lobbyists on GE's account, and who they worked for.Federal contractsWhat federal agencies pay GE.Workplace safetyWhat OSHA found at GE's sites.AircraftThe jets on GE's registration.